A contractor in Davao taught me something about H beams three years ago, and I still think about it whenever I price an order. He had bought a container of beams elsewhere. When his crew started assembling the frames, the flanges were so far off parallel that the connection plates had to be reamed on site - sixty-odd plates, two weekends of grinding, and a crane standing idle the whole time. When he came to us for the replacement order he did not ask about price first. He asked who rolled the steel. That question now gets an answer on every document we send: mill name, heat number, and the measured flange thickness per bundle, written on the packing list where nobody can hide it.
An H beam looks like a simple thing. Two flanges, one web, done. What you are actually buying is the rolling discipline behind it - universal mills that hold the web concentric, controlled cooling so the flange does not warp after saw cutting, straightness held within 0.15% of length. Skip any of those and the steel still looks fine when it comes off the truck. It stops looking fine the week your fitters start shimming every splice plate.
Specifications
| Item | Range |
|---|---|
| European Sections | HEA / HEB / HEM 100–900 mm to EN 10034 |
| American Sections | W-shapes W4x13 to W36x230, ASTM A6 dimensions |
| British Sections | UB / UC 152x152 up to 914x419 mm |
| Grades | ASTM A992 Gr.50, A572 Gr.50, EN S235JR / S275JR / S355J2, JIS SS400 / SM490, GB Q235B / Q355B |
| Length | 6 m and 12 m standard, cut to schedule with ±2 mm tolerance |
| Surface | Mill black, red or grey primer 25 μm, hot-dip galvanized on request |
| Fabrication | Coping, drilling, notching and shot blasting before shipment if you need it |
| Certificates | EN 10204 3.1 mill test certificate, 3.2 with third-party survey on request |
What we argue about internally before a beam ships
Section availability against your schedule, mostly. Anyone can quote a HEA200 on paper. The real question is whether 40 tonnes of it can load before your crane booking expires, and that answer changes by the week. We keep the moving sizes on the rack - HEA/HEB 160 to 400, W8 and W10, the 152x152 UC that half the world builds with. Last quarter a Philippine order needed 18-metre splices, which nobody stocks. We butt-welded them in-house from 12-metre stock, full UT on every weld, and told the client exactly what we had done before he asked.
Then there is grade matching, where I will happily talk a buyer out of money. A Qatar client once insisted on S355 for a single-storey warehouse because his consultant had copied the spec from another drawing. We ran the numbers: S275JR carried his loads with 20% to spare and saved him $34 a tonne. He sent the consultant a thank-you note, oddly enough. If a design is over-specified we say so before you pay for it - and the calculation goes in the email, so check it yourself.
Packing is the boring one, and the one that generates the fewest complaints when done right. Bundles of 3 to 5 tonnes, steel-strapped, two timbers between layers so slings can get out cleanly. Every bundle carries a painted tag: section, grade, heat number, weight. Your tally clerk matches paper to steel in minutes instead of unwrapping bundles under the rain.
And to be fair about the other side: we lose orders too. We do not stock HEM sections, we will not break a 5-tonne minimum for a single beam, and if a mill is mid-campaign on another size we quote the honest lead time rather than the hopeful one. A buyer in Lagos went elsewhere over 8 dollars a tonne last year and came back four months later when his first shipment arrived with camber nobody had measured. That is not a victory lap - I would rather have had the order twice.



Where our beams end up
Pre-engineered building frames, warehouse columns and rafters, mezzanine floors, transmission towers, plus a fair amount of trailer and equipment chassis work. Roughly half our volume goes to Southeast Asia and the Middle East. The rest splits between South America and Africa, with the odd full-rack order to island ports where shipping schedules decide everything. Common sections ship in 7 to 15 days. Off-sizes and odd grades run 20 to 25 days, mostly waiting on the mill rolling schedule - billet, actually, if the grade is unusual. Need beams primed or drilled before loading? Say so early. That adds three or four days, and we would rather tell you now than apologize later.
Send Us Your Section List
Send the drawing, or just the section list - sizes, grade, total tonnage, destination port. A sales engineer replies within 12 hours with a tonne-price, current stock positions, and the earliest vessel we can honestly make. No fake "today only" pricing; the steel market moves too fast for that game and buyers know it.