
Seamless Steel Pipe
Hot-rolled and cold-drawn seamless steel pipe from 10.3 to 720 mm OD, wall 2-60 mm. ASTM A106/A53, API 5L Gr.B-X70, EN 10216, JIS G3454. UT/ET tested, EN 10204 3.1 MTC, 7-20 day delivery.
A boiler fabricator in Indonesia asked us last month why our seamless quote came in 8% above a welded alternative. Fair question. We put both samples on the bench and cut them open. The welded tube was fine, honestly - but his working pressure needed a wall tolerance that only a piercing line guarantees. He took the seamless pipe, and it is running in his plant now. That is what this product is, in one story: solid billet, pierced and rolled, no weld seam anywhere in the wall. The pressure rating is the steel itself.
Specifications
| Item | Range |
|---|---|
| Outer Diameter | Hot-rolled 57–630 mm, cold-drawn 6–219 mm, overall 10.3–720 mm |
| Wall Thickness | 2–60 mm, Sch10–Sch160, STD / XS / XXS |
| American Standards | ASTM A106 Gr.B, ASTM A53 Gr.B, API 5L Gr.B to X70, ASTM A179, A192, A335 |
| European & Japanese Standards | EN 10216 P235GH, 16Mo3, 13CrMo4-5, JIS G3454 / G3455, DIN 17175 ST35.8, ST45.8, ST52 |
| Steel Grade | 20#, 45#, Q345B, 16Mn, Gr.A/B, X42 to X70, ST37, ST52 |
| Length | 5.8 m / 6 m / 11.8 m / 12 m, fixed length cut to order within ±3 mm |
| Process | Hot-rolled, cold-drawn, normalized or quenched and tempered on request |
| End Finish | Plain bevelled ends for welding, threading and couplings on request |
| Testing | Hydro test, ultrasonic and eddy current inspection, EN 10204 3.1 mill test certificate |
Three things we check hard before the pipe ships
Wall thickness. Buyers get burned here more than anywhere else. Plenty of mills measure the average and call it nominal wall, which saves the mill a few percent of steel and quietly lowers the pressure rating. We hold the minimum wall the standard asks for, and the ultrasonic map goes with the goods, batch by batch, if the inspector wants proof.
Grade matching. Tell us the medium, the temperature, and whether the line sees sour service. One chemical plant kept buying A106 Gr.B for a 450°C header and swapping it out every shutdown. We moved them to A335 P11 in March. No complaints since, and two re-orders.
Packing. It sounds trivial until a container lands with scuffed bevels and the welder complains. Caps on both ends, steel-strapped bundles, a heat number tag on every bundle, so the surveyor traces the heat without unwrapping a single one.



Where the pipe ends up
Most of it goes into oil and gas transmission lines, boiler and superheater tubes, heat exchangers, hydraulic cylinder barrels. A steady share is structural, for buyers who refuse a weld seam in the load path. Gr.B and 20# in common sizes sit on the rack, 7 to 15 days out the door. Odd diameters or grades run to order; count on 20 to 25 days, mostly billet sourcing. Cold-drawn cylinder-barrel sizes take longer if a honed finish is required, so plan the machining schedule around that.
Send Us Your Size List
OD, wall, length, the standard you work to, and the destination port. A sales engineer answers within 12 hours with FOB or CIF numbers and current stock positions.
Send Inquiry







